Action, Martigny and Monthey
Pure Action — with a Strong Finish
The Dutch non-food discounter, with over 3,000 stores across 13 European countries, is expanding into Switzerland with its range of decoration, craft, household, textile, and personal care products. teamtischer oversaw the Martigny and Monthey projects from site inspection and technical planning all the way through to execution. HVAC and electrical installations were carried out in coordination with the building services engineers. Around 1,400 m² of floor tiling and 500 m² of drywall were installed at each location, along with entrance façades equipped with roller shutters. It was pure action - due to extremely short construction schedules and overlapping work on both sites. The final stage saw the installation of hundreds of meters of shelving, completing the full store fit-out. The result: everything was finished on schedule, allowing Action to open its new branches right on time.